Prab Stamping Scrap Removal Case Histories
Application: New Addition to Existing Plant
In 1999, this Indiana metal stamper planned ahead to maximize the production potential of a new 14,000 ft2 building addition by adding an in-ground (under press) scrap removal system at the onset of their project. With the advise of knowledgeable Prab consultants, they were able to install a custom engineered system which would fully meet their current and future needs.
Designed to Handle: A wide range of stamping scrap sizes and convey them to a central loadout area.
System Includes:
| • |
Six foot deep pit under presses with safety |
|
grating |
| • |
116 foot long oscillating conveyor |
| • |
Scrapveyor II for material elevations |
| • |
A Steel Belt Shuttle Conveyor system for |
|
automatic and even distribution of material |
| • |
Two fully automated diverter chute systems |
|
to evenly fill dual scrap dumpsters |
| • |
Controls |
Proven Benefits:
| • |
A very clean and productive pressroom |
| • |
Accommodated a wide selection of scrap |
|
sizes |
| • |
No carryover of material in the process |
|
forward |
| • |
Reduced maintenance and the elimination |
|
of housekeeping problems |
| • |
Dependable 24/7 operation |
|
|

New facility - One clean operation
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Click on any photo above for sample application/Prab Solution
|