Application: New Addition to Existing Plant
In 1999, this Indiana metal stamper planned ahead to maximize the production potential of a new 14,000 ft2 building addition by adding an in-ground (under press) scrap removal system at the onset of their project. With the advise of knowledgeable PRAB consultants, they were able to install a custom engineered system which would fully meet their current and future needs.
Designed to Handle: A wide range of stamping scrap sizes and convey them to a central loadout area.
System Includes:
• Six foot deep pit under presses with safety grating
• 116 foot long oscillating conveyor
• Scrapveyor II for material elevations
• A Steel Belt Shuttle Conveyor system for automatic and even distribution of material
• Two fully automated diverter chute systems to evenly fill dual scrap dumpsters
• Controls
Proven Benefits:
• A very clean and productive pressroom
• Accommodated a wide selection of scrap sizes
• No carryover of material in the process forward
• Reduced maintenance and the elimination of housekeeping problems
• Dependable 24/7 operation
Stamping Scrap Systems Brochure
New facility - One clean operation
Click on any photo above for sample application/PRAB Solution